Copper Wire
Standard: JIS,EN,BS,ASTM,GB
Processing Service: Bending, Welding, Decoiling, Punching, Cutting
Delivery Time: 3-30 days
MOQ: 1Tons
Length:Customer request
Trade terms: CIF, FOB, EXW, FCA, DDP
Transaction method: 30%TT,LC
Place of Origin: China
Tel/WeChat:+8619954209201
WhatsApp:+8619954209201
Email:admin@guoyingsteel.com
PRODUCT DESCRIPTION
ItemCopper wire
CategoryJIS H3250-2006,ASTM B152M,GB/T2040-2008,etc
Material

T1,T2,C10100,C10200,C10300,C10400,C10500,C10700,C10800,C10910,C10920,TP1,TP2,

 C10930,C11000,C11300,C11400,C11500,C11600,C12000,C12200,C12300,TU1,TU2,C12500, C14200,

C14420,C14500,C14510,C14520,C14530,C17200,C19200,C21000,C23000,

C26000, C27000,C27400,C28000,C33000,C33200,C37000,C44300,

C44400,C44500,C60800,C63020,C65500,C68700,C70400,

C70600,C70620,C71000,C71500,C71520,C71640,C72200,etc

SizeThickness:as requiredWidth:as requiredLength: as required.
Hardness1/16 hard,1/8 hard,3/8 hard,1/4 hard,1/2hard,full hard,soft,etc
Surfacemill,polished,bright,oiled,hair line,brush,mirror,sand blast,or as required
Application

1. Pancake Coil for ACR, General Engineering Applications 

 2. LWC Coil for ACR, General Engineering Applications

 3. Straight Copper Tubes for ACR and Refrigeration 

4. Inner-grooved copper tube for ACR and Refrigeration 

5. Copper Pipe for Transportation System of water, gas and oil 

6.PE-coated copper tube for water/gas/oil transportation system 

7.Semi-finished Copper tube for industrial applications

Payment Terms

30% T/T in advance as deposit

,70% balance against the B/L copy or 100% irrevocable L/C at sight

MOQ3 tons pre size
Delivery time5-15 days after receiving L/C or deposit
RemarkSpecific requirement of alloy grade,temper or specification can be discussed at your request


4.jpg


FAQ


Q1. How long can make delivery?

A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T; for products need new production for common materials,usually make shipments in 7-10 days; for products need special and rare materials,usually need 15-20 days to make shipment.

 

Q2. Can you provide the samples?

A:Samples can be provided with samples' charge and courier fee by the buyer's side.


Q3: Can we visit your factory?

A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.


Q4. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.

Airline and sea shipping also optional.

For mass products, ship freight is prefered.

 

Q5. Can you accept customize?

A: Yes. It can be customized as per the customers' request.


ONLINE CONSULTATION
SUBMIT
PRODUCTS RECOMMENDED